Milling & Resurfacing Project

MILLING & RESURFACING PROJECT

The Village’s annual milling and resurfacing project is set to begin the week of November 1st. These roadways currently maintain significant pavement deterioration and are recommended to be milled and resurfaced to extend their service life. The following streets are proposed to be milled and resurfaced.

Alamanda DriveVillage Of North Palm Beach Schedule (002)

Omega Place

Evergreen Drive

Lighthouse Drive

Lagoon Drive

Westwind Drive

Dogwood Road

McClaren Road

Golfview Road

Inlet Road

Fairwind Drive

Kingfish Road

Anchorage Road

The roadways will be open to local traffic only while construction is occurring, with the exception of Lighthouse. This will enable the contractor to perform the work as quickly and provide as little disruption as possible to the community. Follow all construction signage in place. Thank you for your cooperation and patience as we work to make the Village of North Palm Beach “The Best Place to Live Under the Sun”!

Aerial Map with Milling and Resurfacing Locations_Part1
Aerial Map with Milling and Resurfacing Locations_Part2
Aerial Map with Milling and Resurfacing Locations_Part3